Rigging
SECOA Theatrical Chain (STC)
Orchestra Shells
Orchestra Pit Fillers & Lifts
 
» Systems & Applications
   » Pit Filler
   » Orchestra Lifts
» Specs & Drawings & Brochures
» Completed Projects & References
Seating
Pipe & Wire Grids
Draperies & Tracks
Lighting Distribution

Press Releases/SECOA News
Careers


Pit Fillers & Lifts Completed Projects
763.506.8800
toll free 800.328.5519
fax 763.506.8844
Contact Us
Lincoln SE High School
Location:   Lincoln, NE
Architect:   Sinclair Hille & Associates
Consultant:   Jones & Phillips
Owner:   Lincoln Public Schools
Completion Date:   September 2009
Scope of Work:   Vortek, Fixtures, Curtains, Projection Screen, Pit Filler
Images:  

Guthrie Theater
Location:   Minneapolis, MN
Architect:   Wold Architectual Alliance Inc.
Consultant:   Fisher Dachs
Contractor:   Guthrie Theater
Completion Date:   May 2006
Scope of Work:   Stage Rigging (3 Theaters), Portable Staging, Stage Curtains, Stage Trap Infill Panels, Retractable Seating Risers, Wire Tension Grids
Images:  

Allegheny College-Vukovich Center
Location:   Meadville, PA
Architect:   Polshek Partnership Architects
Consultant:   Theatre Projects Consultants
Contractor:   Massaro Corporation
Completion Date:   June 2008
Scope of Work:   Motorized Rigging, Pit Filler, Pipe Grid, Curtains
Images:  

Plainfield High School
Location:   Plainfield, IN
Architect:   Schmidt Associates Architects, Inc.
Consultant:   Jones & Phillips Associates
Contractor:   Weddle Bros. Building Group, LLC
Completion Date:   December, 2007
Scope of Work:   Rigging, Motorized Rigging, Pit Lift, Tension Wire Grid, Acoustic Clouds, Curtains, Lighting

River Campus-SE Mo. State Univ.
Location:   Cape Girardeau, MO
Architect:   Jacobs Facilities, Inc.
Consultant:   Theatre Projects Consultants
Owner:   SE Missouri State University
Completion Date:   April, 2007
Scope of Work:   Motorized Rigging, Orchestra Shell, Fire Curtain, Pit Lift, Acoustic Drapes, Lighting Fixtures & Dimming Equipment
Images:  

Epic Auditorium
Location:   Verona, WI
Architect:   Cuningham Group Architecture, PA.
Consultant:   Auerback Pollock Friedlander
Owner:   Epic Systems
Contractor:   J.P. Cullen & Sons, Inc.
Completion Date:   2007
Scope of Work:   Rigging, Vortek, Tension Wire Grid, Motorized Architectural Lighting Battens, Projector Pods

Kettering High School
Location:   Waterford, MI
Architect:   French Associates, Inc.
Consultant:   Schuler & Shook, Inc.-Chicago
Owner:   Waterford School District
Completion Date:   2003
Scope of Work:   Rigging, Fire Curtain, Orchestra Shell, Pit Filler, Tracks, Curtains, Acoustic Curtains
Images:  

Additional Orchestra Pit Filler & Lift References
  Bloomington Arts Center Bloomington MN
  Dekalb County Performing Arts Decatur GA
  East Ridge High School Woodbury MN
  Harvard Westlake Middle School Los Angeles CA
  Lincoln NE High School Lincoln NE
  Lincoln-Way West New Lenox IL
  Mabel Tainter Memorial Theatre Menomonie WI
  Newton Auditorium Denver CO
  Palmer Ridge High School Monument CO
  Pankow Vo-Tech Center Aud. Clinton Township MI